: Update on UGLee the CJ7


CoryB
11-11-2001, 07:49 PM
Well, I finally got the body tub mounted back on the frame this weekend. So far the frame has gotten a 4" BDS lift, extended brake lines, front axle u-joints and bearings, new gas hoses and sending unit and a few other things.

The tub is a replacement that's still rough as he!! but the subframe is there - sheetmetal can be cut out or replaced. :D The tub went on with a 1" Daystar body mount/lift kit. Once I get the floors fixed (for state inspection) I can rewire it and see how the engine sounds. I also got a possible line on a 304 to replace the 258.

Right now, the top edge of the tub comes to about mid-stomach on me. And that's with the P205x15 rollaround mini-tires on it. :eek: I don't think it's gonna fit in the garage once it's finished. Oh well...