This has been a work in progress for all summer now. Sorry for the lack of progress pictures but after working on the bastard all day long I just didn't feel like taking pictures up to this point. Anyway...
Specs:
36' wide by 32' deep
14' 6" finished ceiling high
big door 10' high by 12' wide
small door 8' high by 10' wide
there are 3 courses of block above grade, its a stepped foundation n the deep part there is a total of 8 courses. We laid close to 700 block, a good big of a the mortar was hand mixed. :eek:
So far I have about $13k into it. When I'm all done I should be around $16,000 completely finished.
Here's the list of stuff I got for free:
all the lumber (less the trusses and about 40 sheets of 5/8" OSB)
all of the conduit and service wire (about 300' of 2/0 copper wire)
all of the Tyvek
all of the singles (16 square) and felt paper
the big garage door
I got the stone delivered for free
had a skid steer and hoe to use for free (just had to pay fuel costs)
haven't paid a dime for labor
Right now I am waiting on more stone (still need 30 tons of #8s and 80 tons of #308 recycled concrete) I already have about 120 tons of #308 in the drive and base of the garage and 20 tons of #8. I've spent way to much on stone. :eek:
Pictures:
http://i122.photobucket.com/albums/o267/saftey89/100_1403.jpg
http://i122.photobucket.com/albums/o267/saftey89/100_1404.jpg
http://i122.photobucket.com/albums/o267/saftey89/100_1405.jpg
http://i122.photobucket.com/albums/o267/saftey89/100_1406.jpg
http://i122.photobucket.com/albums/o267/saftey89/100_1407.jpg
http://i122.photobucket.com/albums/o267/saftey89/100_1408.jpg
It will be nice when I can have the other garage back, right now it's my warehouse.
http://i122.photobucket.com/albums/o267/saftey89/100_1409.jpg
Specs:
36' wide by 32' deep
14' 6" finished ceiling high
big door 10' high by 12' wide
small door 8' high by 10' wide
there are 3 courses of block above grade, its a stepped foundation n the deep part there is a total of 8 courses. We laid close to 700 block, a good big of a the mortar was hand mixed. :eek:
So far I have about $13k into it. When I'm all done I should be around $16,000 completely finished.
Here's the list of stuff I got for free:
all the lumber (less the trusses and about 40 sheets of 5/8" OSB)
all of the conduit and service wire (about 300' of 2/0 copper wire)
all of the Tyvek
all of the singles (16 square) and felt paper
the big garage door
I got the stone delivered for free
had a skid steer and hoe to use for free (just had to pay fuel costs)
haven't paid a dime for labor
Right now I am waiting on more stone (still need 30 tons of #8s and 80 tons of #308 recycled concrete) I already have about 120 tons of #308 in the drive and base of the garage and 20 tons of #8. I've spent way to much on stone. :eek:
Pictures:
http://i122.photobucket.com/albums/o267/saftey89/100_1403.jpg
http://i122.photobucket.com/albums/o267/saftey89/100_1404.jpg
http://i122.photobucket.com/albums/o267/saftey89/100_1405.jpg
http://i122.photobucket.com/albums/o267/saftey89/100_1406.jpg
http://i122.photobucket.com/albums/o267/saftey89/100_1407.jpg
http://i122.photobucket.com/albums/o267/saftey89/100_1408.jpg
It will be nice when I can have the other garage back, right now it's my warehouse.
http://i122.photobucket.com/albums/o267/saftey89/100_1409.jpg