71PA_Highboy
02-03-2010, 08:38 PM
While on 'tour' I decided I needed a way to move the axles around the shop... It was annoying to keep walking around the saw horses.
So, I needed a rack to hold 3 - 2 to go into the next project, and then 1 when it gets pulled out.
I had some casters from an abandoned project, and the steel was scrap and leftovers from buying full lengths and the wood some 2x8 scrap.
The casters are a bit small for 3 axles, so I probably won't push it around much fully loaded.
So, I needed a rack to hold 3 - 2 to go into the next project, and then 1 when it gets pulled out.
I had some casters from an abandoned project, and the steel was scrap and leftovers from buying full lengths and the wood some 2x8 scrap.
The casters are a bit small for 3 axles, so I probably won't push it around much fully loaded.