![]() |
![]() |
|
|
#1 (permalink) |
|
Pirate4x4 Addict!
|
Deep Creek crossing closing for 2 months
I have not confirmed this first hand, but evidently the Forest Service will be closing the Deep Creek Trail (3N34D) at the creek between Arrowhead and Big Bear for 2 months beginning on 5/17 to build a bridge over the creek. No word on how much of the lower rock garden will be preserved.
Just a heads up. Dave |
|
|
|
|
|
#4 (permalink) | |
|
Registered User
Join Date: Jul 2001
Member # 5842
Location: One of three places in CA, you can guess?
Posts: 759
|
Quote:
This improvement work of the T6 crossing is intended to satisfy the objections of anti-motorized and anti-access organizations who believe vehicle crossings at the T6 crossing have a negative impact on the riparian (creek) habitat. The intent is to minimize the release of soil into the creek by vehicles crossing the creek (to protect German Brown Trout). A parallel reason for this work is improve the irregular bottom of the existing rock embedded concrete (the work accomplished a few years back to address the last time complaints were made). The irregular rock bottom unseats some motorcycle riders when the try to cross the creek (a public safety hazard for novice and child riders). This work will make the crossing less dangerous for motorcycle riders. The OHV and 4X4 community will be well served if we honor the closure and allow the USFS to complete this improvement work unmolested. The work is intended to benefit recreation with continued motorized access through Deep Creek as the long term goal (and is preferred to a bridge, one of the other debated options). Let your local clubs know about this closure, why it is a benefit, and the schedule dates (run Deep Creek before 5/19 or after 7/30 (and be flexible with the completion schedule, it's government work and they expect two months duration).Happy Trails! Ed A. Stevens ============================== ----- Forwarded by Robin Eliason/R5/USDAFS To: Allison L Stewart/R5/USDAFS Subject: T-6 Crossing The contractor, Southwest Construction, is scheduled to start construction of the T-6 Crossing on May 19. The road will be closed for approximately 2 months. The project includes construction of two 20' wide open bottom, concrete box culverts with a common wall between so that the stream bottom remains nearly unimpeded. The concept is similar to open bottom arch crossings we have constructed in the last few years on Hooks Creek Road at Hooks Creek, Daley Truck Trail at West Fork of City Creek, and West Fork Cucamonga Truck Trail at Cucamonga Creek. The embankment will be encased in concrete with grouted stone on the slopes. Footings will extend 5' below existing creek bed to provide for scour protection. Top of the crossing will be concrete, 12' wide between curbs. Expect posted advisory signs at beginning of Hooks Creek Road, 2N26Y, where it leaves the County Road, at intersection of 3N34 with Hooks Creek Road, at intersection of 3N16 with Green Valley Lake Road, and at the intersection of 3N34 with 3N16 at Crab Flats Campground. Please forward this message to all who need to know, including any announcement that may need to be published in local newspapers. |
|
|
|
|
|
|
#5 (permalink) |
|
Pirate4x4 Addict!
|
I have spoken with the chief engineer, and have seen the progress personally.
Regardless of the impact, both in temporary disruption in access and long term changes to the trail setup, this project was needed to ensure continued access to this trail. That said, I have concerns about the future of the crossing with regards to rock garden immeditately across the creek. The road has been graded and will remain that way for fire fighter access (another necessary improvement). The bridge crosses the creek at a higher elevation than the existing rock garden. As such the garden has been completly removed and or covered. Without this 'gatekeeper' more underequiped rigs will venture farther into the trail resulting a variety of complications. As stated, I've spoken with the engineer and he has assured me that they will create a New garden across the bridge. I have volunteered my time, if needed, in the creation. Is there anyone on the board from the Dirt Devils? I believe this is thier adopt-a-trail. I was wondering if they were taking an active role in the design and defintition of the future garden. Thanks Dave
__________________
Ultra4 and King of the Hammers |
|
|
|
|
|
#6 (permalink) | |
|
Registered User
Join Date: Jul 2000
Member # 1372
Location: Just east of Tahoe
Posts: 1,514
|
Quote:
Can anyone show me the logic in this endeavor?
__________________
Rockcrusher I've already been to hell . . . Anything more is a minor inconvenience!! |
|
|
|
|
![]() |
| Thread Tools | |
| Display Modes | |
|
|