well spent all day saturday with the guys doing our concrete work. they will be pouring 45 yards saturday around 6am. it all has to be pumped in
i will finaly have my shop 32x36'
12x20' will be a clean room for assy eng's and working on axles and such and then the 12x12 behind that will be a tool room with the drill press solvent tank hyd press welders tourches welding bench on wheels and such then the 20x36 will be the work shop
they are also pouring a 8' x 32' slab in front. the whole shop will be 6" thick with 1/2" rebar ran through out the floor.
there will also be a 20x24 loft above the shop with 8' walls. it will be a kick back place with a couch tv fridge and such with a sliding glass door with a patio that looks out the back of the property towards the creek.
there will be a 30" tall by 36" wide x 18' work bench along one wall under the stares to the loft.
there is also a sidewalk that goes from the house to the shop that is probly 100' long and 6' wide. and a nothere sidewalk in front of the house.
i will try and get some pics posted
i will finaly have my shop 32x36'
12x20' will be a clean room for assy eng's and working on axles and such and then the 12x12 behind that will be a tool room with the drill press solvent tank hyd press welders tourches welding bench on wheels and such then the 20x36 will be the work shop
they are also pouring a 8' x 32' slab in front. the whole shop will be 6" thick with 1/2" rebar ran through out the floor.
there will also be a 20x24 loft above the shop with 8' walls. it will be a kick back place with a couch tv fridge and such with a sliding glass door with a patio that looks out the back of the property towards the creek.
there will be a 30" tall by 36" wide x 18' work bench along one wall under the stares to the loft.
there is also a sidewalk that goes from the house to the shop that is probly 100' long and 6' wide. and a nothere sidewalk in front of the house.
i will try and get some pics posted