Test - Pirate4x4.Com : 4x4 and Off-Road Forum
 
Pirate4x4.Com : 4x4 and Off-Road Forum  

Go Back   Pirate4x4.Com : 4x4 and Off-Road Forum > Miscellaneous > Testing
Notices

Reply
 
Share LinkBack Thread Tools Display Modes
Old 11-16-2019, 08:37 AM   #1 (permalink)
Granite Guru
 
Aggie06's Avatar
 
Join Date: Nov 2008
Member # 123554
Location: Portland, TX
Posts: 726
Test

http://<br /> https://www.ccbiznews....uspended<br />

Design work on the new Harbor Bridge has been suspended by the Texas Department of Transportation, announced TxDOT in a statement late Thursday, November 14. The suspension, which happened sometime in the last month, came after the National Transportation Safety Board declared on October 22 that a fatal bridge collapse in Florida was caused by design flaws.

FIGG Bridge Engineers Inc., which is designing the Harbor Bridge in Corpus Christi, also designed a pedestrian bridge for Florida International University that collapsed in March 2018, killing six people and injuring 10 others. Flat Iron/Dragados LLC, is contractor on both projects.
Advertisement

TxDOT released a statement about the suspension after a local TV station inquired about a rumor that Flat Iron/Dragados had been removed from the project.

“The Texas Department of Transportation (TxDOT) continues to fully review the recent findings by the National Transportation Safety Board (NTSB) for applicability to TxDOT projects," the statement reads. "During this review, TxDOT has asked Flatiron/Dragados LLC, the developers of the Harbor Bridge Replacement Project, to suspend design activities on the Harbor Bridge project."

TxDOT also recently announced that the bridge project is two years behind schedule and would not be completed until sometime in 2023 rather than 2021.

NTSB’s investigation into the Florida bridge determined that “load and capacity calculation errors made by FIGG Bridge Engineers Inc. are the probable cause” of the collapse.”

FIGG released a lengthy statement after the findings denying responsibility.

“The accident was the result of a complex series of events and failings by parties at multiple stages of the project,” the statement reads.

NTSB also faulted the Florida Department of Transportation for failing to provide appropriate oversight during construction. Of the 11 recommendations from the NTSB, five were aimed at Florida’s transportation department.

Both bridges were designed using an accelerated construction process known as design build, which allows for construction to begin before design is complete.

Sent from my iPhone using Tapatalk

Last edited by Aggie06; 11-16-2019 at 08:37 AM.
Aggie06 is offline   Reply With Quote Quick reply to this message
Reply

Quick Reply
Message:
Options

Register Now

In order to be able to post messages on the Pirate4x4.Com : 4x4 and Off-Road Forum forums, you must first register.
Please enter your desired user name, your email address and other required details in the form below.
User Name:
Password
Please enter a password for your user account. Note that passwords are case-sensitive.
Password:
Confirm Password:
Email Address
Please enter a valid email address for yourself.

** A VERIFICATION EMAIL IS SENT TO THIS ADDRESS TO COMPLETE REGISTRATION!! **

Email Address:
Insurance
Please select your insurance company (Optional)

Log-in


Thread Tools
Display Modes

Posting Rules
You may post new threads
You may post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT -7. The time now is 02:12 PM.


Powered by vBulletin® Version 3.8.8 Beta 4
Copyright ©2000 - 2019, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.6.0 ©2011, Crawlability, Inc.
User Alert System provided by Advanced User Tagging (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.