Joined
·
3,149 Posts
In prep for my 4 link, I relocated the gas tank back 4 inches and up 2 inches. I exteded the frame back 5 inches and added a bumper that will be an air tank. I ran a 2" square sleeve up in the frame, plug welded it in, used a 3x3 square as the extension, plug welded it to the sleeve and butt welded the whole mess together..
Than the fawking rain came...
Much Much more to come!
Than the fawking rain came...
Much Much more to come!