so i have F/R tom woods shafts. each has 7" of splines. i gained 3" lift from SUA to SOA. i have 3.5" splines out at level which leaves 3.5" of splines left for flex.
i think i need to get them both lengthened which will cost me about $100 per shaft.
am i wrong?
it is not a pavement rig.....just hardcore rocks
i think i need to get them both lengthened which will cost me about $100 per shaft.
am i wrong?
it is not a pavement rig.....just hardcore rocks